GTC Version Dated 06.08.2020.pdf

AGB_englisch_200806.pdf
Preview of GTC Version dated 06.08.2020
🔗 Source: unterer.at
📊 Size: 69 KB
👤 Author: Natalie Linke
⬇️ Downloads: 148

Summary

Unterer's General Terms and Conditions, dated 06.08.2020, outline the binding agreement for shipment orders, applicable to all future business relations. Key points include:
1. Orders are binding without counter-confirmation, with only the most recent version of the Terms and Conditions in effect.
2. Contractors must have valid carrier's liability insurance with a minimum coverage of EUR 250,000.
3. Unterer assumes Contractors hold necessary transport permits and documentation.
4. Sub-carrier use requires express written permission, with non-compliance resulting in liability and a EUR 10,000 penalty.
5. Advertising freight inquiries or orders is prohibited, with a EUR 5,000 penalty for non-compliance.
6. Additional and trans-shipments are prohibited, treated as total loss.
7. Contractors must use secure parking, secure trucks against theft, and only handover cargo to authorized recipients.
8. Fixed loading and unloading times must be adhered to, with non-compliance resulting in a contractual penalty.
9. Shipments must be transferred and delivered by the driver, with any conflicts reported to Unterer.
10. Loads must be safe for traffic, with the Contractor responsible for costs resulting from non-compliance.
11. Delays or impediments must be reported immediately, with failure to comply resulting in replacement by Unterer at the Contractor's expense.
12. Damage must be reported immediately, with the Contractor responsible for costs associated with damage assessment.
13. Pallet exchange must occur immediately, with failure to comply resulting in billing and administration fees.
14. Demurrage regulations outline eligible costs, reporting requirements, and remuneration.
15. Invoices must be accompanied by original documents, including CMR-Waybills and pallet notes, with temperature records required for temperature-controlled transports.

Description

Unterer's General Terms and Conditions, dated 06.08.2020, outline the binding agreement for shipment orders, applicable to all future business relations.

Technical Information

  • File Format: PDF
  • File Size: 69 KB
  • Pages: 5
  • Language: EN
  • Author: Natalie Linke
  • Total Downloads: 148
  • Last Updated: 2 hours ago

Document Overview

This PDF document about GTC Version dated 06.08.2020 provides comprehensive information and guidance. Whether you're a beginner or advanced user, this resource offers valuable insights into GTC Version dated 06.08.2020.

Related Topics

If you're interested in GTC Version dated 06.08.2020, you might also want to explore:

Download GTC Version dated 06.08.2020 eBooks for free and learn more about GTC Version dated 06.08.2020. These books contain exercises and tutorials to improve your practical skills, at all levels!

Not satisfied with this document? We have related documents to GTC Version dated 06.08.2020, try searching with similar keywords: GTC Version dated 06.08.2020, Order to make interim distribution and extend initial order to October 30, 2020 (French version only) – dated April 20, 2020, Order extending the time for filing the proposal (French version only) – dated November 6, 2020, Attachment to Report dated 02/28/2020 - Service Area Map, Letter from Northwest Territories Tourism dated May 28, 2020 to the Premier regarding Remote Lodge Permitting, Letter dated October 23, 2020 from Association of Consulting Engineering Companies to MLA Frame Lake on Statements Regarding Com, Attachment to Report dated 11/18/2020 - Grant Application, Press Release Dated 27.01.2020

You can download PDF versions of the user's guide, manuals and ebooks about GTC Version dated 06.08.2020, you can also find and download for free A free online manual (notices) with beginner and intermediate, Downloads Documentation, You can download PDF files (or DOC and PPT) about GTC Version dated 06.08.2020 for free, but please respect copyrighted ebooks.