Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report.pdf

Section_1-Methodology_Report.pdf
Preview of Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report
🔗 Source: lacoast.gov
📊 Size: 297 KB
👤 Author: jmorris
⬇️ Downloads: 95

Summary

Morris P. Hebert, Inc. (MPH) was contracted by the Coastal Protection and Restoration Authority (CPRA) to perform surveying and mapping services for the Caminada Headlands Back Barrier Marsh Creation Project (BA-171) in Lafourche Parish, Louisiana. The project aims to create, maintain, and nourish approximately 430 acres of marsh through hydraulic dredging. MPH's scope of services included topographic, bathymetric, magnetometer, and geophysical investigations, as well as obtaining permission and access from landowners, notifying navigable waterway hazards, and conducting horizontal and vertical control surveys. The surveys were conducted to gather data for the project's design and implementation.

Description

Morris P. Hebert, Inc.

Technical Information

  • File Format: PDF
  • File Size: 297 KB
  • Pages: 9
  • Language: EN
  • Author: jmorris
  • Total Downloads: 95
  • Last Updated: 3 months ago

Document Overview

This PDF document about Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report provides comprehensive information and guidance. Whether you're a beginner or advanced user, this resource offers valuable insights into Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report.

Related Topics

If you're interested in Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report, you might also want to explore:

Download Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report eBooks for free and learn more about Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report. These books contain exercises and tutorials to improve your practical skills, at all levels!

Not satisfied with this document? We have related documents to Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report, try searching with similar keywords: Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report, Island Road Marsh Creation and Nourishment (TE-117) Geotechnical Engineering Services (Exploratory Marsh Creation Area Geotechni, Island Road Marsh Creation And Nourishment Te 117 Geotechnical Engineering Services Exploratory Marsh Creation Area Geotechni, Marin Headlands National Park, Operation, Maintenance, Repair, and Rehabilitation Plan for Lost Lake Marsh Creation and Hydrologic Restoration Project (TE-0072, South Grand Chenier Marsh Creation Final Design Report, East Leeville Marsh Creation and Nourishment (BA-194) 95% Design Report, Lost Lake Marsh Creation and Hydrologic Restoration Survey Report

You can download PDF versions of the user's guide, manuals and ebooks about Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report, you can also find and download for free A free online manual (notices) with beginner and intermediate, Downloads Documentation, You can download PDF files (or DOC and PPT) about Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology Report for free, but please respect copyrighted ebooks.